Author Topic: Earthquake AfterAction Report  (Read 1706 times)

Offline LeoMarr

  • Gold Member
  • *
  • Posts: 150
    • View Profile
    • Awards
Earthquake AfterAction Report
« on: September 13, 2011, 11:40:01 PM »
UNIT:252
DIVISION:UNIFORM
CLEARANCE:Divisional Leadership

Enter Password: ************
ACCESS GRANTED

Connecting to Network
Connecting...
Connecting...
Connecting...
CONNECTION ESTABLISHED

New File Opened: Earthquake After-Action Report
Send To: Universal
Subject: Earthquake After-Action Report

<::|| ASDF text ||::>

An Earthquake began, After reading testing rosters It appears..
[Section Deleted]


The Power in the Nexus began to fluctuate as the earthquake began to cause large scale destruction... The Nexus Bottom layer almost completely collapsed into the Basement area.. Causing massive power ruptures. Radios stopped functioning briefly, Unable to connect to each other, units were forced to act on voice alone.

One hour in Units were trapped outside and inside of the Nexus, Unable to communicate. Doors began to fluctuate and power in the city shut down completely. Gas ruptures flooded the Underside of the Nexus, Rupturing into the Plaza area. Citizens were given extinguishers to clean the fire, as units were busy.

Dispatch...
Section Deleted
Saving File As: Earthquake After-Action Report
Saving File...
Saving File...
Saving File...
File Saved

Disconnecting 252
Console Shut Down.
CONNECTION LOST
 


Chars:
UNION-DvL.252 Molding Men out of recruits.
Thatch Goodwin Keeping Incognito.
Quote from: Blt
leomarr is cool.

Offline Nuke

  • Gold Member
  • *
  • Posts: 204
    • View Profile
    • Awards
Re: Earthquake AfterAction Report
« Reply #1 on: September 14, 2011, 12:28:05 PM »
UNIT:305
DIVISION:GRID
CLEARANCE:DvL

Enter Password: ************
ACCESS GRANTED

Connecting to Network
Connecting...
Connecting...
Connecting...
CONNECTION ESTABLISHED

New File Opened:Nexus Damage Report
Send To: Universal
Subject: Nexus Damage Report

Unit 305 of Grid Reporting status of City 18 Nexus of Block Distract 1

Power system back online after rerouting power to back up systems. Main system offline for repairs. Backup systems are stable. Damage to D2 Airlock area is seal off. Scanners show the area around the airlock is heavy damage and will need a OTA team to assist with repairs. Transmit Tower D31 is offline all radios rerouted to Tower D32 and D33. GOC has minor damage to console L32 and L33 and will need a shipment of console model C-069 and C-070.

Supplies Needed for repairs :

Console Model C-069 : Amount 1
Console Model C-070 :  Amount 1
Screen Model  S-993 : Amount 2
Airlock Door Model H-8821 : Amount 3
Lights Model L-360 : Amount 16
Transmit Tower Model K-43132 : Amount 1
Power Generator Model G-97442/3 : Amount 3

Current Nexus Status Without Needed Supplies : 67%

Also Re question a OTA team to assist with repairs in D2. Area is hostile and unsafe to perform work will need OTA for a sweep and securely.

Saving File As: Nexus Damage Report
Saving File...
Saving File...
Saving File...
File Saved

Disconnecting 305
Console Shut Down.
CONNECTION LOST

 

SimplePortal 2.3.7 © 2008-2024, SimplePortal